Bishop Fenwick High School Football Field, Peabody, MA
Design Build Contractor: Argus Construction
Owner: Bishop Fenwick High School
Argus designed and constructed the new synthetic turf football field including: the Aco sports drain between the track and field, field drainage, paved event areas, concrete anchor curbing and field grading. Argus also coordinated the synthetic turf installation, the new track surfacing and the sports lighting which was paid for directly by the owner.
Contract Price: $400,000      |      Completed: Spring 2007


5 Shawsheen Avenue
Unit 2
Bedford, MA 01730
call us
1-781-275-7417

Copyright © 2009. ARGUS Construction Corp. All rights reserved.